Order Flow Typical example of basic work for LAN wiring

Inquiry

In-house layout changes or computer wiring after moving

Construction of optimal in-house network

Construction of in-house LAN

Security enhancement


 Proposal and design of network construction

  • We discuss with the end user to propose an optimal network environment and overall design, then organize specifications.
  • Our staff in LAN construction consistently design, prepare drawings, construct and manage the site to provide a complete high-quality service.
  • With strong connections with major network component manufacturers, ASE-Net obtains various information and updates in the industry to realize higher standard design and construction.

Guideline for wiring work

【SCS work】

  • We provide wiring work conforming to the wiring standard TIA/EIA-568-C.2 in metal-based wiring work.
  • We have experience in constructing all types of cabling systems from Category 5 and Category 6A.
  • As we are a registered partner with cable manufacturers, a manufacturer's warranty can be obtained.
    (Terms and conditions shall apply to the warranty approved by manufacturers. For more information, please consult us separately.)

【Optical fiber network construction work】

  • We provide wiring work conforming to the latest standard TIA/EIA-568-C.3 in optical fiber-related wiring work.
  • A manufacturer's warranty can be obtained for optical fiber-related cabling. (Terms and conditions shall apply to the warranty approved by the manufacturer. For more information, please consult us separately.)

【Cable test】

  • By using the latest reliable cable analyzer testing machine manufactured by Fluke, we provide high-quality and high performance wiring systems as our clients desire.
  • We submit a calibration certificate of the testing machine and test report together with complete documentation.

User support after construction

  • By obtaining a warranty approved by the manufacturer, a 15- or 25-year system warranty for cabling can be applied.
  • We promptly respond to any accident or additional construction request regardless of the warranty status.